Commissioning is the foundation of ISSAC E&C and our most core business area.

We have accumulated experience and technology through performing various commissioning tasks at major shipyards in Korea. ISSAC E&C's commissioning service promises to pursue customer satisfaction beyond simply completing projects within schedule and budget.
Pre-commissioning Execution<br>(Including MC) Pre-commissioning Execution<br>(Including MC)
Pre-commissioning Execution
(Including MC)
Commissioning Execution
Vendor Commissioning

Pre-commissioning
Execution (MC included)

Pre-commissioning is the process of confirming whether subsystems are installed in accordance with installation standards and certification standards, including design, in a static state without power or electricity supply.

In the pre-commissioning stage, the following items are mainly inspected.

Conformity checks of equipment items – Mechanical completion / Punch clearance
Static/de-energized tests of equipment items
Mechanical/Piping: Alignment of all equipment and flushing and cleaning of the pipes and vessels
Instrument: Calibration and cable continuity tests
Electrical: Insulation and continuity tests
Functional tests and operational tests
Issue the pre-commissioning, commissioning weekly progress report based on PCS data
Pre-commissioning Execution<br>(Including MC) Pre-commissioning Execution<br>(Including MC)
01

Detailed Execution Items by Field

Operational systems
Non-operational systems
Discipline Activities
Mechanical
  • • Visual inspection for complete and correct installation
  • • Internal inspection of tanks and vessels
  • • Alignment
  • • Load testing of lifting & rotating equipment
  • • Hot oil flushing
  • • Bolt tensioning
  • • Dimension control
  • • Preservation
Electrical
  • • Visual inspection for complete and correct installation
  • • Insulation and continuity testing of cables
  • • Insulation testing of generator, transformers and motors, panels, distribution board etc
  • • Earthing checks
  • • Static check of switches and control devices
  • • Battery preparations
  • • Lighting and socket outlet checks
  • • Area completion
  • • Heat tracing
  • • Preservation
Instrument/
Telecommunication
  • • Calibration and testing of instruments prior to installation
  • • Visual inspection for complete and correct installation
  • • Insulation and continuity testing of cables
  • • Cleaning, flushing, pressure and leak testing of pneumatic and hydraulic tubing
  • • Adjustment of control, alarm and shutdown settings
  • • Loop testing
  • • Function testing of control systems
  • • Function testing of field instruments
  • • Hot oil flushing of instrument tubing
  • • Area completion
  • • Preservation
Piping
  • • NDE carried out
  • • Welding Procedure Specification
  • • Removal of all items subject to damage during flushing, cleaning and pressure testing
  • • Flushing of pipework
  • • Chemical cleaning and testing of pipework
  • • Drying of tested pipework
  • • Preservation of tested pipework
  • • Reinstatement of all items after testing
  • • Final inspection of pipework
  • • Test ISO's and P&ID's showing the extent of each pressure test
  • • Pneumatic and hydraulic tubing
  • • Hot oil flushing of pipework
  • • Bolt tensioning - Flange Management System (FMS)
  • • Insulation
  • • Flow coding
  • • On-line chemical compound leak sealing
  • • On-line safety valve testing(TREVI test)
  • • On-site machining
  • • Valve reconditioning & overhaul
HVAC
  • • Visual inspection for complete and correct installation
  • • Cleaning of ductwork
  • • Leak testing of ductwork
  • • Alignment checks
  • • Mechanical functions checks of equipment
  • • Preservation
  • • Flow coding
  • • Safety
  • • Visual inspection for complete and correct installation
  • • Preservation
  • • Area completion